Tuesday, 11 November 2014

November 2014






The steel for our narrowboat was delivered to the boatyard during the first week of November.
At the moment  much of the steel is lying on the
floor of the workshop ready to be cut into shape
 for the build of the boat.






Some of the steel has already been made into the bottom part of the hull.  








This is a view of the bow of the boat and down the port side of the boat.












This a shot of the bow, in the classic line for a narrowboat.  what you are seeing in these photos will mostly be under the water.